N.C. DENR orders Duke Energy to stop discharges from second pipe

(Mountain XPress) The N.C. Department of Environment and Natural Resources ordered Duke Energy late Tuesday afternoon to immediately halt discharges of material from a leaking 36-inch stormwater pipe beneath the coal ash basin in Eden where another stormwater pipe failed and caused a spill of coal ash into the Dan River. DENR staff issued the order to Duke Energy Tuesday afternoon after initial tests the state agency conducted indicated the presence of elevated levels of arsenic. The elevated levels of arsenic are one of the key indicators of the presence of coal ash. DENR identified the unauthorized discharge during its ongoing investigation of the coal ash spill at the Dan River power plant in Eden.

Read the full story HERE>

Advertisements

Posted on February 19, 2014, in Uncategorized. Bookmark the permalink. Leave a comment.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: